
Location: Saratoga, CA · Completed: June 2025 · Type: Panel upgrade and relocation
The problem
This Saratoga home’s main panel had been enclosed inside a shed, making it hard to reach in an emergency and difficult for PG&E to access. The homeowner also wanted a 200A panel ready for future solar.
What we did
Submitted the PG&E application and pulled permits
Relocated the main panel out of the shed to an accessible location
Installed a new 200A solar-ready Square D Homeline surface-mount panel (30-space, 42-circuit)
Installed a new 1-1/2" overhead service riser with 2/0 service conductors
Transferred all existing circuits from the old panel to the new one
Installed new grounding and a water line bond
Added whole-home surge protection
Passed inspection
The result
A new 200A panel in an accessible location, ready for solar, with every existing circuit moved over, updated grounding and surge protection, and the service inspected and reconnected.
Is your panel hard to get to?
Panels get boxed in over the years by sheds, closets, cabinets, and additions. That’s a problem in an emergency, and PG&E and inspectors need clear access. If your panel is enclosed or blocked, an upgrade is a good time to move it. Choosing a solar-ready panel at the same time avoids another panel change if you add solar later. Read our Bay Area electrical panel upgrade guide, or get a quote for a panel upgrade.
Related projects
Drummond Electric LLC · CSLB C-10 #1096595