Location: West San Jose, CA · Completed: 06/2023 · Type: Panel upgrade
The project
This West San Jose home, near the Cupertino border, needed a 200A panel upgrade on an overhead service. The panel was set into a stucco wall. The goal was to swap it and get power back on the same day.
What we did
Submitted the PG&E application and pulled permits
Cut the stucco and removed the old panel
Installed a new 200A panel
Installed a new 1-1/2" overhead service riser with 2/0 service conductors
Added whole-home surge protection and an intersystem bonding bridge
Passed City of San Jose inspection in time for the meter release
Coordinated with PG&E to reconnect power the same day
The result
A new 200A panel and riser, surge-protected and bonded, with the power back on the same day. The homeowners didn’t have to go a night without electricity.
How long is the power off for a panel upgrade?
A panel swap itself usually takes a day. The power stays off until the city inspects the work and PG&E reconnects the meter. If those steps aren’t lined up, a family can be without power overnight or longer. We schedule the inspection and PG&E reconnect in advance so the power comes back the same day whenever possible. Read our Bay Area electrical panel upgrade guide, or get a quote for a panel upgrade.