
Location: Saratoga, CA · Completed: [Month Year] · Type: 200A panel upgrade and relocation
The problem
This Saratoga home needed a new 200A panel, but the existing panel sat above a set of steps. A panel in that spot doesn’t have the level working space required in front of it, so the new one couldn’t simply go back in the same place.
What we did
Relocated the panel away from the steps, farther from the PG&E service drop
Submitted the PG&E service application and the relocation plans to the City of Saratoga
Installed a new 200A Square D Homeline surface-mount panel (30-space, 42-circuit)
Bent and ran conduit to reach the PG&E service wires at the new location
Installed two new ground rods with #4 copper grounding conductor, run through the basement to the rods and bonded to the water line
Added whole-home surge protection and an intersystem bonding bridge
The result
A new 200A panel in a code-compliant location, with a grounding system brought up to current standards, surge protection, and room for future circuits.
Moving your electrical panel?
If your panel is over steps, in a closet, or in another spot that no longer meets code, an upgrade is often the right time to move it. Relocating a panel means coordinating with PG&E on the service connection and getting city approval, which adds steps but avoids problems at inspection. We handle the PG&E application and city submittals for you. Read our Bay Area electrical panel upgrade guide, or get a quote for a panel upgrade.
Related projects
Performed by Drummond Electric, CSLB C-10 #1096595