Location: Los Gatos, CA · Completed: March 2023 · Type: Federal Pacific panel replacement, EV charger readiness
The problem
This Los Gatos homeowner wanted to add an EV charger, but the home was still running on its original Federal Pacific main panel. Federal Pacific Stab-Lok breakers have a history of failing to trip during overloads, and the old panel wasn’t a safe place to add a large new load like an EV charger.
What we did
Submitted the PG&E application and coordinated the disconnect and reconnect
Removed the Federal Pacific main panel
Installed a new main panel with room for the EV charger circuit
Installed new ground rods and a water line bond
Added whole-home surge protection
Pulled permits and passed inspection
The result
The Federal Pacific panel is gone, and the home is ready for an EV charger, with a modern main panel and updated grounding, bonding, and surge protection, all inspected and signed off.
Getting an EV charger with an older panel?
An EV charger is one of the biggest loads in a home, often on a 40A to 60A circuit. If your panel is a Federal Pacific or Zinsco, or doesn’t have the capacity, adding a charger to it isn’t safe. Many insurers won’t cover homes that still have FPE panels anyway. Replacing the panel first makes room for the charger and future electrification. Read about the dangers of Zinsco and FPE panels, or get a quote for a panel upgrade and EV charger.
Related projects
Federal Pacific Subpanel Replacement and Kitchen and Bath Rewire in Alum Rock, San Jose
SPAN Smart Panel and EV Charger Installation in Morgan Hill, CA
Drummond Electric LLC · CSLB C-10 #1096595