
Location: Los Gatos, CA · Completed: May 2026 · Type: EV charger installation
https://drummondelectric.com/service-areas/los-gatos-ca
The situation
The homeowner wanted a Level 2 charger in their garage, but the home has a 125A panel. Many homeowners with smaller panels assume they need a costly service upgrade before they can add a charger. Often they don’t. The charger just has to be sized to what the panel can actually carry.
https://drummondelectric.com/services/ev-charger-installation
What we did
Ran a load calculation to confirm the 125A panel could support a dedicated EV circuit
Installed a 50A, 240V circuit with the ChargePoint charger set to 40A, a size the existing panel could handle without an upgrade
Installed a GFCI disconnect ahead of the charger, which the Town of Los Gatos requires for EV charger installations
Ran MC cable surface-mounted from the disconnect to the charger, secured neatly along the garage wall
Mounted the ChargePoint charger in the garage
Permitted with the Town of Los Gatos and passed inspection
Result
The homeowner has Level 2 charging at 40A, roughly 25–30 miles of range per hour for most EVs, so the car is full by morning, with no panel upgrade needed.
Have a 100A or 125A panel and want an EV charger? You may not need an upgrade. We’ll run a load calculation first and size the charger to what your panel can handle. If your panel is truly maxed out, we’ll explain your options, such as load management or an upgrade. Call (408) 661-0219 or request an estimate online.
https://drummondelectric.com/services/ev-charger-installation
Drummond Electric LLC · CSLB C-10 #1096595