


ocation: Downtown San Jose, CA · Completed: [Month Year] · Type: Battery backup
The project
A downtown San Jose homeowner wanted battery backup to keep their essentials running through outages and store energy for later use. We installed a GM Energy battery bank with an inverter, battery disconnects, and a critical load panel for the circuits that matter most.
What we did
Installed the GM Energy battery bank
Installed the inverter and battery disconnects
Installed a critical load panel in the basement, mounted on a backer board with clean metal conduit runs
Moved the home’s essential circuits into the critical load panel and labeled each breaker
Connected the critical load panel to the batteries and inverter
Tested the system, including switchover to battery power
The result
During an outage, the battery system automatically powers the home’s essential circuits while the rest of the house waits for grid power. The battery’s energy goes where it matters and lasts longer.
Why a critical load panel?
Most home batteries can’t run an entire house for long. A critical load panel holds just the essential circuits, so the battery’s power goes where it’s needed. Choosing which circuits go in it is the key decision. We walk through it with you before the install. Battery disconnects let the system be safely shut down for service. Get a quote for battery backup.
Related projects
Siemens Feed-Through Main, 200A Subpanel and Franklin aGate Installation in Los Gatos
SPAN Smart Panel with 200A Main and Tesla Powerwall in San Jose
200A Feed-Through Panel and SPAN Smart Panel Installation in Downtown San Jose
Drummond Electric LLC · CSLB C-10 #1096595